(Rebid) Phase V Belmont Complex Ice Rink Floor Replacement Project

  Drawings (click to expand/collapse)
Name Date Size
R-000 Cover Sheet & Drawing Index 5/13/2021 1.3 MB
R-001 Abbreviations & Legend 5/13/2021 540.2 KB
R-002 Refrigeration Equipment Schedules 5/13/2021 788.7 KB
R-003 Refrigeration Piping Schedules 5/13/2021 843.9 KB
R-100 Demolition Plan for Machine Room 5/13/2021 464.0 KB
R-200 Machine Room Layout 5/13/2021 526.8 KB
R-201 Section Views 5/13/2021 536.3 KB
R-202 Safety 5/13/2021 1.4 MB
R-203 Condenser Platform 5/13/2021 461.4 KB
R-250 P & ID 5/13/2021 568.4 KB
R-251 Chilled Glycol Schematic 5/13/2021 461.0 KB
R-252 Condenser Water System & Water Treatment Schematic 5/13/2021 465.2 KB
R-300 Demolition Plan for Rink Bed 5/13/2021 464.2 KB
R-301 Subheating Plan 5/13/2021 466.9 KB
R-302 Rink Tube & Header Plan 5/13/2021 559.9 KB
R-303 Machine Room Layout 5/13/2021 553.8 KB
R-350 Hot Glycol Schematic 5/13/2021 462.0 KB
R-351 Rink Construction Details 5/13/2021 559.3 KB
R-352 Rink Construction Details Continued 5/13/2021 593.4 KB
R-400 Refrigerent System Cutsheets 5/13/2021 6.5 MB
R-450 Details 5/13/2021 540.9 KB